Small complex with zinc roof
"Construction of an integrated center consisting of a 200-square-meter mosque for 315 worshippers, a 10-classroom school, a solar-powered artesian well, a 7-room clinic (zinc roof + false ceiling + ceramic flooring), furnished, and 14 bathrooms. Details: A mosque with a capacity of 315 worshippers, covering an area of 200 square meters, featuring a zinc roof, a concrete foundation, iron doors and windows, and four bathrooms and five ablution areas. Interior furnishings include: carpets, two loudspeakers, six lamps, and 200 copies of the Quran with shelves. (Friday prayers are held here.) A 10-classroom school with a capacity of 300 students, covering an area of 450 square meters, including an administration office, a zinc roof, false ceilings, ceramic tile flooring, iron doors and windows, and 10 bathrooms. Furnishings include 300 school desks and 10 teachers' desks. *Clinic (7 rooms + reception room) with an area of 102.5 square meters, featuring a zinc ceiling, false ceilings, marble flooring, iron doors and windows, 4 bathrooms, and furnishings including: 8 fans, 20 lamps, 7 beds, 16 chairs, and 8 tables. *70-80 meter artesian well with solar-powered electric pump + backup generator (Honda 2000 watt type) + 10,000 liter tank + water extension - lifespan of 20 years (covered with a slab, ceramic flooring above it)
Category
Residential complexes and villages
Country
UGANDA
Amount
1,029,980.00AED
Remaining amount
1,029,980.00AED
Collected amount
0.00 AED
IMPORTANT NOTE ABOUT YOUR PROJECT
Please note that if the targeted amount for the project created by you and shown via the link is not completed (within six months) since the date of creating the link, the collected amount will be transferred to (a similar project) for the project as a contribution for which the targeted amount was not completed.
And the donor has no right to request a refund or change it to another project after creating the link. We also inform you that at the beginning of each calendar year, contracts with external implementing parties are updated, which -sometimes - results in a difference in the cost of the project and thus prices may change.